Subserie SU5 - Post-fire reports, meeting minutes, architectural plans and move records

Área de título y declaración de responsabilidad

Título apropiado

Post-fire reports, meeting minutes, architectural plans and move records

Tipo general de material

  • Documento textual
  • Dibujo arquitectónico

Título paralelo

Otra información de título

Título declaración de responsabilidad

Título notas

Nivel de descripción

Subserie

Código de referencia

UCM-SE10-SU5

Área de edición

Declaración de edición

Declaración de responsabilidad de edición

Área de detalles específicos de la clase de material

Mención de la escala (cartográfica)

Mención de proyección (cartográfica)

Mención de coordenadas (cartográfica)

Mención de la escala (arquitectónica)

Scale 1" to 10'

Jurisdicción de emisión y denominación (filatélico)

Área de fechas de creación

Fecha(s)

  • 1987-1992 (Creación)

Área de descripción física

Descripción física

12cm of textual records and architectural drawings.
Note: Includes 11 architectural drawings.

Área de series editoriales

Título apropiado de las series del editor

Títulos paralelos de serie editorial

Otra información de título de las series editoriales

Declaración de responsabilidad relativa a las series editoriales

Numeración dentro de la serie editorial

Nota en las series editoriales

Área de descripción del archivo

Nombre del productor

Historial de custodia

Alcance y contenido

This sub-series contains documents related to the rebuilding and move efforts in the wake of the fire that destroyed the Sherbrooke street church building on May 25, 1987. It includes reports on the state of the church buildings after the fire, as well as internal correspondence between Church officers and external correspondence with various legal, consulting, architectural and construction firms. It also includes calls for and received project proposals, along with financial analyses and draft resolutions to be submitted to the congregation regarding said proposals.

Notably there is also a copy of an ultimately rejected proposal, with drawings, called the "Simpson Project." It aimed to build a mixed use high-rise tower on the site of the Sherbrooke street church, which would’ve included space for the Church. There are also 11 full sized architectural drawings of the project. The project was controversial in the greater local community and the sub-series also contains correspondance from community members and minutes of city consultation meetings.

Área de notas

Condiciones físicas

Origen del ingreso

Arreglo

The full sized architectural plans can currently be found on Shelf 2-4.

Idioma del material

  • inglés

Escritura del material

    Ubicación de los originales

    Disponibilidad de otros formatos

    Restricciones de acceso

    Condiciones de uso, reproducción, y publicación

    Instrumentos de descripción

    Materiales asociados

    Materiales relacionados

    Acumulaciones

    Identificador/es alternativo(os)

    Número estándar

    Número estándar

    Puntos de acceso

    Puntos de acceso por materia

    Puntos de acceso por lugar

    Puntos de acceso por autoridad

    Tipo de puntos de acceso

    Idioma de descripción

    • inglés

    Escritura de la descripción

      Fuentes

      Área de Ingreso