Área de título y declaración de responsabilidad
Título apropiado
Tipo general de material
- Dibujo arquitectónico
- Documento textual
- Material gráfico
Título paralelo
Otra información de título
Título declaración de responsabilidad
Título notas
Nivel de descripción
Código de referencia
Área de edición
Declaración de edición
Declaración de responsabilidad de edición
Área de detalles específicos de la clase de material
Mención de la escala (cartográfica)
Mención de proyección (cartográfica)
Mención de coordenadas (cartográfica)
Mención de la escala (arquitectónica)
Jurisdicción de emisión y denominación (filatélico)
Área de fechas de creación
Fecha(s)
-
1907-1996 (Creación)
Área de descripción física
Descripción física
14cm of textual records, graphic material and architectural plans
Note: Includes 32 architectural plans and 29 b&w photos
Área de series editoriales
Título apropiado de las series del editor
Títulos paralelos de serie editorial
Otra información de título de las series editoriales
Declaración de responsabilidad relativa a las series editoriales
Numeración dentro de la serie editorial
Nota en las series editoriales
Área de descripción del archivo
Nombre del productor
Historial de custodia
Alcance y contenido
This sub-series contains records related to the renovation and maintenance of the main church building and property located at the corner of Sherbrooke and Simpson before the fire in 1987. It also contains correspondance and internal reports related to a move proposed in 1983 that never occurred, as well as correspondence and legal documents related to dealings with the neighbouring Port Royal apartments from the 1960s and early 1970s. These include agreements and communication related to maintenance and use of a shared lane between the two properties, as well as the sale of a piece of the Church's lot to Port Royal in the early 1970s.
The majority of the series is comprised of architectural and zoning plans, as well as meeting minutes and internal Church reports, regarding the renovation and maintenance of the main church building. The architectural plans were drawn up by the firm Chadwick Pope & Edge through the 1960’s and early 1970’s. The zoning plans are from 1912, 1954, 1962 and 1972, presenting a good representation of how the lot changed over time. The reports and meeting minutes were generated by the Building Committee and Special Committee of Acoustics, including a survey of the congregation on space needs. There are also a 29 black and white photographs. 26 of these are of the interior of the church, used in a property study and focusing mostly on structural defects. The 3 remaining photographs are external shots of the church building from 1970. Also included is correspondence from la Musée des beaux arts related to the building’s stained glass windows.
Área de notas
Condiciones físicas
Origen del ingreso
Arreglo
Idioma del material
Escritura del material
Ubicación de los originales
Disponibilidad de otros formatos
Restricciones de acceso
Condiciones de uso, reproducción, y publicación
Instrumentos de descripción
Materiales asociados
Acumulaciones
Identificador/es alternativo(os)
Número estándar
Número estándar
Puntos de acceso
Puntos de acceso por materia
Puntos de acceso por lugar
Puntos de acceso por autoridad
Tipo de puntos de acceso
Idioma de descripción
- inglés